The risk register is a living document, and new information about a risk or new risks will be added as they are discovered.
a. True
b. False

Answers

Answer 1

The statement is true that the risk register is an essential tool for project management, which records all identified risks, their probability, impact, and strategies for mitigating them.

It is a living document that is updated regularly throughout the project's lifecycle to reflect any new risks or changes in the existing risks. The risk register should be reviewed and updated frequently to ensure its accuracy and usefulness in managing project risks. Any new information about a risk or new risks should be added to the register as soon as they are discovered to keep the project team informed and prepared. Therefore, the risk register is an ongoing process that requires constant monitoring and management throughout the project's duration.

To know more about risks visit :-

https://brainly.com/question/30168545

#SPJ11


Related Questions

suppose that when an individual's income increases, their total tax paid increases and average tax rate stays the same. this income tax is:

Answers

This type of income tax is called a progressive income tax. In a progressive income tax system, the tax rate increases as an individual's income increases. This means that individuals with higher incomes are taxed at a higher rate than those with lower incomes.

Under a progressive income tax system, their total tax paid may increase even though their average tax rate remains the same. This is because their higher income puts them in a higher tax bracket, which results in a higher tax rate. On the other hand, if their income decreases, their total tax paid may decrease even though their average tax rate remains the same.

Progressive income tax systems are often used by governments to reduce income inequality and promote social justice. By taxing higher-income individuals at a higher rate, governments can redistribute wealth and fund public goods and services that benefit everyone in society.  

Learn more about income tax Visit:  brainly.com/question/30157668

#SPJ4

lebron received $68,400 of compensation from his employer and he received $693 of interest from a municipal bond. what is the amount of lebron's gross income from these items?

Answers

LeBron received $68,400 of compensation from his employer and he received $693 of interest from a municipal bond. The amount of LeBron's gross income from these items is $69,093.

To calculate the gross income, you add together all the income sources. In this case, LeBron received $68,400 of compensation from his employer and $693 of interest from a municipal bond. Adding these two amounts gives us the gross income:

$68,400 + $693 = $69,093

Gross Income contains all money you earn that is not expressly removed from taxation under the Internal Revenue Code (IRC).

Therefore, LeBron's gross income from these items is $69,093.

To learn more about Gross income click here

https://brainly.com/question/2194020

#SPJ11

In Pioneer Ville,
The price elasticity of demand for bus rides is
-0.5
the income elasticity of bus rides is 0.62
and cross price elasticity of demand for bus rides with respect to
gasoline is -0.2.

Answers

In Pioneer Ville, the given elasticities provide information about the responsiveness of the demand for bus rides to changes in price, income, and the price of gasoline.

1. Price Elasticity of Demand: The price elasticity of demand for bus rides being -0.5 indicates that a 1% increase in the price of bus rides would result in a 0.5% decrease in the quantity demanded.  2. Income Elasticity of Demand: The income elasticity of bus rides being 0.62 indicates that a 1% increase in income would lead to a 0.62% increase in the quantity demanded of bus rides.

3. Cross Price Elasticity of Demand: The cross price elasticity of demand for bus rides with respect to gasoline being -0.2 suggests that a 1% increase in the price of gasoline would lead to a 0.2% decrease in the quantity demanded of bus rides.

Learn more about  Price Elasticity here

https://brainly.com/question/30161342

#SPJ11

Which of these are sets of cash flows where all the initial cash flows are negative and all the subsequent ones are either zero or positive?
Multiple Choice
a. Expected cash flows
b. Normal cash flows
c. Time line cash flows
d. Non-normal cash flows

Answers

The correct answer is Normal cash flows. A normal cash flow pattern is a consistent pattern of cash inflows and outflows over time.

What is the distinction between regular and irregular cash flow streams?

Cost (negative CF) followed by a series of positive cash inflows is a typical cash flow stream. Just one sign shift. Nonnormal cash flow stream - Two or more sign changes.

All of the initial cash flows are negative in this case, indicating cash outflows or investments made at the start of the period. Following cash flows can be either zero or positive, indicating no cash flow or cash inflows. This pattern implies an initial investment or cost, followed by a potential return or positive cash flows in the future.

Therefore, Normal cash flows are frequently associated with investment projects or business ventures in which there is an initial outlay of funds followed by the expectation of generating positive cash flows over time.

Learn more about Normal cash flows from the given link.

https://brainly.com/question/28503523

#SPJ4

As firms grow, owner managers rarely need to hire functional specialists to handle the increased information-processing burden. Is this statement true or false?
A. True
B. False

Answers

The statement is false. As firms grow, owner managers often find themselves overwhelmed with the increased information-processing burden and need to hire functional specialists to handle specific areas such as accounting, marketing, and human resources.

These specialists bring their expertise and knowledge, allowing the owner manager to focus on the overall management and strategy of the company. Without functional specialists, the company may not be able to keep up with the demands of growth, leading to inefficiencies and potential failure. Therefore, hiring functional specialists is essential for managing the increased information-processing burden that comes with firm growth. The statement "As firms grow, owner managers rarely need to hire functional specialists to handle the increased information-processing burden" is false. As firms expand, the complexity of their operations increases, necessitating the hiring of functional specialists. These specialists possess expertise in specific areas such as finance, marketing, or human resources and help manage the additional workload. By delegating responsibilities to functional specialists, owner managers can focus on strategic decision-making and overall business growth. Therefore, hiring functional specialists is essential for handling the increased information-processing burden as firms grow.

To know more about  human resources visit:

https://brainly.com/question/10583893

#SPJ11

50 A vida, game console manufacturer allow's retailers lo accept dafective units so that they can be repaired and sold as refurbished. Which supply chain integraton strategy is the video game console manufacturer using? Lean supply chain Reverse logistics Backward vertical Integration Competitive bidding with retailers NEXT > BOOKMARK

Answers

The video game console manufacturer, 50 A vida, is utilizing a lean supply chain integration strategy rather than reverse logistics. In a lean supply chain, the focus is on minimizing waste, maximizing efficiency, and delivering high-quality products to customers.

By allowing retailers to accept defective units for repair and subsequent sale as refurbished, 50 A vida aims to optimize their supply chain by reducing waste and maximizing the value of their products. This strategy aligns with the principles of lean manufacturing, which emphasize continuous improvement and eliminating non-value-added activities.

In the case of refurbished units, the output is indeed at its best, as the defective units undergo repair and reconditioning to bring them back to a functional and desirable state. This approach helps to optimize resources, reduce costs, and provide customers with a cost-effective option while maintaining the quality standards of the brand.

Hence, the video game console manufacturer, 50 A vida, is employing a lean supply chain integration strategy.

To know more about refurbished refer to:

https://brainly.com/question/11715412

#SPJ11

Isabella invested in a stock for five years. The annual return over the past five years were: 14.4%, 28.7%, 38.2%, 19.4%, and 38.0%, respectively. What was her average annualized rate of return over the past five years?

Answers

Isabella's average annualized rate of return over the past five years was 33.8%. The calculations are as follows:

Average Annualized Rate of Return = [(1 + Rate of Return 1) x (1 + Rate of Return 2) x ... x (1 + Rate of Return n)]^(1/n) - 1

Where n is the number of years (in this case, 5), and the Rate of Return is the annual return for each year.

Plugging in the values we have, we get: Average Annualized Rate of Return = [(1 + 0.144) x (1 + 0.287) x (1 + 0.382) x (1 + 0.194) x (1 + 0.380)]^(1/5) - 1

Simplifying the equation, we get the following: Average Annualized Rate of Return = [2.522^(1/5)] - 1

Calculating this value, we get: Average Annualized Rate of Return = 0.338 or 33.8%

Learn more about the Average Annualized Rate of Return here: brainly.com/question/14651832.

#SPJ11

Which situation encourages the sale of domestic goods and tourism? A. inflation. B. dumping. C. outsourcing. D. devaluation. E. tariffs.

Answers

The situation that encourages the sale of domestic goods and tourism is D. devaluation. Devaluation is the deliberate reduction in the value of a country's currency relative to other currencies. When a country's currency is devalued, its exports become cheaper for other countries to buy, and its imports become more expensive for its own citizens to buy.

This means that domestic goods become relatively cheaper than foreign goods, and tourists are encouraged to visit the country because their money goes further. For example, if the value of the United States dollar was devalued relative to the euro, then European tourists would find it cheaper to travel to the US, and US exports would become cheaper for European countries to buy. This would encourage tourism in the US and the sale of domestic goods to other countries.

On the other hand, A. inflation, B. dumping, C. outsourcing, and E. tariffs do not encourage the sale of domestic goods and tourism. Inflation is the increase in the price of goods and services, which makes them more expensive for consumers, including tourists. Dumping is the practice of selling goods in another country at a lower price than they are sold for in the home country, which can harm domestic producers. Outsourcing is the practice of hiring workers outside of a country, which can lead to a decrease in domestic production. Tariffs are taxes on imported goods, which can make them more expensive for consumers, including tourists. In summary, devaluation is the situation that encourages the sale of domestic goods and tourism. It makes domestic goods relatively cheaper than foreign goods, and encourages tourists to visit the country because their money goes further.

To know more about domestic goods visit :

https://brainly.com/question/30737007

#SPJ11

the most lucrative activity of public accountants typically is

Answers

The most lucrative activity for public accountants typically involves providing advisory and consulting services to clients. These services may include strategic financial planning, tax planning, risk management, and business valuation. Public accountants who specialize in these areas can earn high salaries due to their specialized knowledge and expertise.

Additionally, as businesses continue to face complex financial challenges, the demand for skilled accountants who can help navigate these challenges remains high. However, it's worth noting that the exact earning potential for public accountants can vary based on factors such as their level of experience, industry specialization, and geographic location. Overall, public accounting offers a diverse range of career paths and opportunities for those looking to pursue a lucrative and rewarding career in finance.

To know more about public accountants  visit :-

https://brainly.com/question/30463798

#SPJ11

Which of these computes days' sales in receivables? a)Receivables turnover/ 365 b)Accounts receivables/ 365 c)365/ sales d)365/ Receivables turnover

Answers

The correct option that computes days' sales in receivables is d) 365/ Receivables turnover.

Days' sales in receivables is a financial ratio that measures the average number of days it takes for a company to collect its accounts receivable. It indicates the efficiency of a company's credit and collection policies. The formula for calculating days' sales in receivables is 365 divided by the receivables turnover ratio.

The receivables turnover ratio measures how quickly a company collects its accounts receivable during a given period. It is calculated by dividing net credit sales by the average accounts receivable. The ratio represents the number of times accounts receivable is turned over (collected) during the year.

By taking the reciprocal of the receivables turnover ratio and multiplying it by 365, we can obtain the average number of days it takes for a company to collect its receivables. This provides valuable insights into the liquidity and collection efficiency of the company's receivables.

Therefore, option d) 365/ Receivables turnover is the correct choice for computing days' sales in receivables.

Learn more about receivables turnover ratio

https://brainly.com/question/27523896

#SPJ11

a firm's real capacity is not limited by members of its supply chain. question 3select one: true false

Answers

False. A firm's real capacity can be influenced and limited by members of its supply chain. The supply chain consists of all the entities involved in the production, distribution, and delivery of goods or services, including suppliers, manufacturers, distributors, and retailers.

The capacity of a firm is determined not only by its own internal resources and capabilities but also by the capacity and performance of its supply chain partners. Bottlenecks, delays, or inefficiencies in the supply chain can impact the firm's ability to meet demand and utilize its full capacity. Therefore, the members of the supply chain can have a significant impact on a firm's real capacity.A firm's real capacity can indeed be influenced and limited by members of its supply chain. The efficiency and effectiveness of the supply chain partners play a crucial role in determining the overall capacity of the firm.

To learn more about supply, https://brainly.com/question/30086410

#SPJ11

what are the barriers that prevent business decision-makers and/or public sector organizations from automatically making energy efficient choices?

Answers

There are several barriers that can prevent business decision-makers and public sector organizations from automatically making energy-efficient choices. These barriers include:

Lack of awareness: Many decision-makers may lack awareness or understanding of the benefits and potential cost savings associated with energy efficiency measures. They may not be familiar with available technologies or may underestimate the potential impact of energy-efficient choices.

Upfront costs: Implementing energy-efficient measures often requires upfront investment, which can be a barrier for organizations with limited budgets or short-term financial goals. The perceived high initial costs may deter decision-makers from prioritizing energy efficiency.

Limited expertise: Organizations may lack the internal expertise or resources to assess and implement energy-efficient solutions. This can make it challenging to evaluate options, understand technical requirements, and navigate complex decision-making processes.

To learn more about energy-efficient, visit here

https://brainly.com/question/14916956

#SPJ4

Everything else being equal, a firm considering outsourcing would find all of the following desirable except:
Multiple Choice
O it can maintain tight control over knowledge.
O proprietary information will be disclosed to the supplier.
O control over operations will be maintained by the firm.
O its supplier has more expertise in whatever is being outsourced.
O total costs will be lower for outsources goods or services.

Answers

A firm considering outsourcing would find all of the following desirable except the disclosure of proprietary information to the supplier.

The other options are all benefits that a firm can enjoy by outsourcing. By outsourcing, a firm can maintain tight control over knowledge and operations, which can lead to increased efficiency and productivity. Outsourcing to a supplier with more expertise in the outsourced function can also bring in new knowledge and skills to the firm, which can improve its overall performance. Finally, outsourcing can lead to lower costs for goods and services, which can improve the firm's profitability. However, it is important for the firm to carefully evaluate the risks of outsourcing, including the potential for the disclosure of proprietary information to the supplier, and take steps to mitigate these risks.

To know more about outsourcing visit :-

https://brainly.com/question/29544430

#SPJ11

question content area which of the following is required by the sarbanes-oxley act? a.a report on internal control b.a vertical analysis c.a price-earnings ratio d.a common-sized statemen

Answers

A report on internal control is a specific requirement imposed by the sarbanes-oxley act.

the requirement imposed by the sarbanes-oxley act is  a: a report on internal control.

the sarbanes-oxley act (sox) was enacted in the united states in 2002 to improve corporate governance and enhance financial reporting transparency. it introduced several requirements for publicly traded companies to strengthen internal controls and financial reporting practices.

one of the key provisions of sox is section 404, which mandates that companies establish and maintain effective internal control over financial reporting. this includes documenting, evaluating, and reporting on the effectiveness of internal controls to ensure the accuracy and reliability of financial statements. the report provides an assessment of the company's internal control structure and processes, highlighting any weaknesses or deficiencies that may impact the reliability of financial reporting.

Learn more about financial here:

https://brainly.com/question/28319639

#SPJ11

In 1984, sales of prerecorded cassettes surpassed vinyl LPs for the first time aided in large part by the popularity of the:
a) Walkman
b) iPod
c) Discman
d) Gramophone

Answers

In 1984, sales of prerecorded cassettes surpassed vinyl LPs for the first time aided in large part by the popularity of the Walkman.

The Walkman was an innovative portable cassette player that was introduced by Sony in 1979, and it quickly became a cultural phenomenon.The Walkman made music portable and personalized for the first time, allowing people to listen to music on the go without being tethered to a bulky stereo system. It was small enough to fit in a pocket or purse and featured a headphone jack that allowed people to listen to their music without disturbing others.In addition to its portability, the Walkman's popularity was also fueled by the rise of the cassette tape. Cassettes were smaller and more durable than vinyl records, making them easier to transport and less susceptible to damage. They also allowed for longer playing times, which meant that people could enjoy entire albums without having to flip over a record or change a disc.The Walkman remained popular throughout the 1980s and 1990s, and its influence can still be felt today in the form of digital music players like the iPod. While the technology may have changed, the desire for portable and personalized music remains the same.

To know more about Walkman visit :-

https://brainly.com/question/11277336

#SPJ11

Which one of the following is a variable cost for a call centre? Select one: O A. Computer equipment OB. Telephone charges oc. Office manager's salary OD, Office rent

Answers

The variable cost for a call centre is option B: Telephone charges.

Variable costs are expenses that change in proportion to the level of production or activity. In the context of a call centre, telephone charges directly relate to the volume of calls made or received. As call volume increases or decreases, the cost of telephone charges will also vary accordingly. This makes it a variable cost for the call centre.

On the other hand, the other options listed are not variable costs for a call centre:

Option A: Computer equipment is typically a fixed cost as it is a one-time investment or incurs regular maintenance costs regardless of call volume.Option C: The office manager's salary is likely a fixed cost as it is a regular salary expense that remains relatively stable regardless of call volume.Option D: Office rent is usually considered a fixed cost as it is a recurring expense that remains constant regardless of call volume.

Therefore, among the given options, the variable cost for a call centre is telephone charges (option B).

To learn more about variable cost, Visit:

https://brainly.com/question/28481161

#SPJ11

A firm cannot maintain above-normal profits over the long run a. Without the existence of a cartel. b. Unless barriers to entry exist. c,Unless predatory pricing occurs. d.Without retaliation occurring.

Answers

The correct answer to the question is b. Unless barriers to entry exist. In order for a firm to maintain above-normal profits over the long run, it must have some sort of advantage that prevents new firms from entering the market and competing with it.

This advantage can be in the form of patents, exclusive licenses, economies of scale, or other types of barriers to entry. Without such barriers, new firms can enter the market and drive down prices, leading to lower profits for all firms. Cartels, predatory pricing, and retaliation are all strategies that can help a firm maintain its profits in the short run, but they are not sustainable over the long run. Ultimately, a firm's ability to maintain above-normal profits depends on its ability to create and sustain a competitive advantage that prevents new firms from entering the market and competing with it.

To know more about Unless barriers visit:

https://brainly.com/question/25257899

#SPJ11

a common tactic in a financial-incentive political strategy is

Answers

A common tactic in a financial-incentive political strategy is campaign contributions.

Candidates receive financial support from individuals or organizations in exchange for favorable policies or access to power. These contributions can help fund expensive campaigns, influence policy decisions, and establish relationships with influential donors. Such financial incentives often shape the political landscape, as candidates prioritize the interests of their donors to maintain their support and secure re-election. This practice has been subject to scrutiny, as it raises concerns about undue influence and the potential for policy decisions that prioritize the interests of wealthy donors over the general public. Campaign finance reforms and transparency measures are often proposed to address these concerns and promote a more equitable political system.

Learn more about financial-incentive here:

https://brainly.com/question/29767675

#SPJ11

If the reserve ratio is 10 percent and a bank sells a bond for $2,000 to a Federal Reserve Bank, the bank can expand its loans by a maximum of: O $1,000 $200. O $2,000. O $20,000.

Answers

The bank can expand its loans by a maximum of $1,800.

If the reserve ratio is 10 percent, it means that banks are required to hold 10 percent of their deposits as reserves and can loan out the remaining 90 percent. In this scenario, if a bank sells a bond for $2,000 to a Federal Reserve Bank, the bank receives $2,000 in reserves. Based on the reserve ratio of 10 percent, the bank is required to hold 10 percent of the $2,000 as reserves, which is $200. This means that the bank can expand its loans by the remaining amount, which is

= $2,000 - $200

= $1,800.

Learn more about Federal Reserve Bank here:

https://brainly.com/question/7486364

#SPJ11

Regardless of the specific type of long-term debt, which of the following is normally required with debt transactions?
A. to repay the debt
B. to pay dividends
C. to pay interest
D. A and C are both correct

Answers

With all types of long-term debt, it is usually required to have both collateral and a signed contract. This ensures that the borrower has some form of assets to back up the loan and that there is a legal agreement in place outlining the terms of the debt.

When entering into any long-term debt transaction, it is important to have collateral in case the borrower is unable to repay the loan. This could be in the form of property, equipment, or other valuable assets that the lender can claim if the debt is not repaid. Additionally, having a signed contract ensures that both parties understand the terms of the debt and what is expected of them. This can include repayment schedules, interest rates, and any penalties for late or missed payments. Both of these requirements are important for protecting both the lender and the borrower in a long-term debt transaction.

know more about debt transactions, here:

https://brainly.com/question/19405794

#SPJ11

If the 17 percent interest rate quoted on Dave’s loan had been
compounded monthly, what would have been the effective annual
interest rate charged on the loan?

Answers

If the 17 percent interest rate quoted on Dave's loan had been compounded monthly, the effective annual interest rate charged on the loan would have been approximately 19.56%.

The effective annual interest rate can be calculated using the formula below:

Effective annual interest rate = (1 + r/n)ⁿ - 1

Where r is the stated interest rate and n is the number of compounding periods per year.

In this case, the stated interest rate is 17% and the compounding period is monthly. So, n = 12 (since there are 12 months in a year). Therefore, the effective annual interest rate can be calculated as:

Effective annual interest rate = (1 + 0.17/12)¹² - 1≈ 0.1956 or 19.56%

Therefore, if the 17 percent interest rate quoted on Dave's loan had been compounded monthly, the effective annual interest rate charged on the loan would have been approximately 19.56%.

To know more about annual interest rate, refer to the link below:

https://brainly.com/question/29298757#

#SPJ11

Formal training that is specifically tied to business needs and imperatives is the way to go! If we can train people to do those things that make our company more effective and efficient, then we will be more successful. If we let people do what they want and learn what they want through informal means, we might not get the right knowledge, skills and abilities that we need to make our company successful.
Do you agree with me? Why?

Answers

Yes, I completely agree with the statement that formal training that is specifically tied to business needs and imperatives is the way to go.

Training employees on specific business needs and imperatives will enable them to learn the right knowledge, skills and abilities that they need to make the company successful.Informal learning methods may be good in certain situations, but they cannot replace formal training which provides employees with the right knowledge and skills that are relevant to their job. This type of training can be customized to meet specific business needs and imperatives. The employees can learn exactly what they need to know to perform their job efficiently. In addition, it provides employees with a sense of accomplishment and recognition for their work which motivates them to work even harder.In conclusion, formal training that is specifically tied to business needs and imperatives is important for the success of any company. It is the most effective way to train employees on the specific knowledge and skills they need to perform their job efficiently and effectively. This is important for the growth and success of any company. Therefore, companies should invest in formal training programs for their employees to ensure they have the right knowledge and skills to make the company successful.

Know more about business here:

https://brainly.com/question/15826771

#SPJ11

In a Statement of Retained Earnings, which statement is correct? Multiple Choice O Both cash dividends and stock dividends would be deducted, only for common stock. Statement of Retained Earnings is a rollforward presenting the opening balance for the period, plus net income for the year, minus all dividends. It may be adjusted for prior period errors, if significant. Prior period adjustments are always a deduction from opening Retained Earnings balance. Ending Retained Earnings balance excludes Net Income for the year.

Answers

The correct statement regarding a Statement of Retained Earnings is:

Statement of Retained Earnings is a rollforward presenting the opening balance for the period, plus net income for the year, minus all dividends. It may be adjusted for prior period errors if significant.

A Statement of Retained Earnings is a financial statement that shows the changes in a company's retained earnings balance over a specific period, usually a year. It starts with the opening balance of retained earnings, adds the net income for the year, and deducts all dividends declared and paid during the year. The resulting amount is the ending balance of retained earnings.

The statement provides information on how a company's retained earnings have changed over time, reflecting the impact of net income and dividends on the accumulated profits or losses of the business.

It is important to note that the statement may also include adjustments for prior period errors if they are significant. These adjustments can either increase or decrease the opening balance of retained earnings.

The ending balance of retained earnings reflects the accumulated profits or losses retained by the company after considering the net income for the year and any dividends declared and paid.

The Statement of Retained Earnings is a useful tool for understanding the changes in a company's retained earnings balance. It provides insights into the company's profitability, dividend distributions, and any adjustments made for prior period errors.

To know more about Retained Earnings, visit

https://brainly.com/question/25631040

#SPJ11

researchers at deloitte university suggested that blockchain could
a. increase the need for more security when using cash alternatives. b. improve financial transactions. c. All of the above are true. d. increase the number of intermediaries in most legal transactions. e. completely replace money as a means of payment.

Answers

The answer is: b. Improve financial transactions. Blockchain technology has the potential to enhance the efficiency, transparency, and security of financial transactions. It can reduce transaction costs and time, while also providing a secure and decentralized method of record-keeping.

Based on the information provided, the researchers at Deloitte University suggested that blockchain could improve financial transactions. Additionally, it is important to consider the limitations and challenges that may arise with the implementation of blockchain technology in various industries.

However, it does not necessarily increase the need for security in cash alternatives, increase intermediaries, or completely replace money as a means of payment. While blockchain technology has the potential to improve financial transactions. This leads to a more streamlined and trustworthy financial ecosystem.

To know more about  Blockchain technology visit:-

https://brainly.com/question/31116390

#SPJ11

sally received $66,600 of compensation from her employer and she received $450 of interest from a corporate bond. what is the amount of sally's gross income from these items?

Answers

The amount of Sally's gross income from these items is $67,050. Gross income represents the total income earned by an individual before any deductions or taxes are applied.

In this case, Sally received $66,600 of compensation from her employer, which includes her salary, wages, and any other forms of taxable income provided by her employer. This amount contributes to her gross income. Additionally, Sally received $450 of interest from a corporate bond, which is another source of income that adds to her gross income.

To calculate the gross income, we simply add up the compensation and interest:

$66,600 + $450 = $67,050

It's important to note that gross income includes all taxable income earned by an individual, such as wages, salaries, tips, interest, dividends, rental income, and other sources. However, it does not take into account any deductions or exemptions that might reduce the taxable income. Gross income serves as a starting point for determining an individual's tax liability and is used to calculate various taxes and contributions based on the applicable tax laws and regulations.

To learn more about Sally's gross income, Click here:

https://brainly.com/question/32075657

#SPJ11

On December 31, 2020, Wallace Co. is determining whether goods in-transit should be included or excluded from the physical inventory count. One shipment in-transit to Wallace Co. for $39,000 was shipped f.o.b. shipping point from a vendor and was expected to arrive on January 1, 2021. One shipment in-transit to Wallace Co. for $118,000 was shipped f.o.b. destination from a vendor. The goods are expected to arrive on January 2, 2021. One shipment in-transit from Wallace Co. for $26,400 was shipped f.o.b. destination to a customer. The merchandise is expected to arrive on January 3, 2021 What shipment amount(s) (if any) should be included in the physical inventory count on December 31, 2020?

Answers

The shipment amount(s) that should be included in the physical inventory count on December 31, 2020, are as follows:

1. Shipment in-transit from a vendor, f.o.b. shipping point: $39,000

This shipment should be included because it was shipped f.o.b. shipping point, indicating that the title and ownership of the goods passed to Wallace Co. once they were shipped. Therefore, Wallace Co. has control over the goods, even though they are in transit, and they should be included in the physical inventory count.

2. Shipment in-transit from a vendor, f.o.b. destination: Not included

This shipment should not be included in the physical inventory count because it was shipped f.o.b. destination. In this case, the title and ownership of the goods do not pass to Wallace Co. until they reach their destination. Since the goods are still in transit, Wallace Co. does not have control over them and should not include them in the physical inventory count.

3. Shipment in-transit to a customer, f.o.b. destination: Not included

This shipment should not be included in the physical inventory count because it was shipped f.o.b. destination. Similar to the previous scenario, the title and ownership of the goods do not pass to the customer until they reach their destination. Therefore, Wallace Co. should not include these goods in their physical inventory count.

In conclusion, only the shipment in-transit from a vendor, f.o.b. shipping point, with a value of $39,000, should be included in the physical inventory count on December 31, 2020. The other shipments, both incoming and outgoing, should not be included as they have not yet reached their respective destinations and the ownership has not transferred.

To know more about Physical Inventory, visit

https://brainly.com/question/16907887

#SPJ11

time remaining 59 minutes 7 seconds00:59:07 item 33 time remaining 59 minutes 7 seconds00:59:07 in september, numbers incorporated sold 45,000 units of its only product for $284,000, and incurred a total cost of $265,000, of which $29,000 was fixed costs. the flexible budget for september showed total sales of $340,000. among variances of the period were: total variable cost flexible-budget variance, $8,500u; total flexible-budget variance, $71,000u; and, sales volume variance, in terms of contribution margin, $31,000u. the sales volume variance, in terms of operating income, for september was: multiple choice

Answers

The sales volume variance, in terms of operating income, for september was $1.0667.

To calculate the sales volume variance in terms of operating income, we need to determine the contribution margin and the actual operating income.

First, let's calculate the contribution margin per unit:

Contribution Margin per Unit = (Total Sales - Total Variable Costs) / Number of Units Sold

Contribution Margin per Unit = ($284,000 - $236,000) / 45,000 units

Contribution Margin per Unit = $48,000 / 45,000 units

Contribution Margin per Unit = $1.0667 (rounded to four decimal places)

Next, let's calculate the actual operating income:

Actual Operating Income = Total Sales - Total Variable Costs - Total Fixed Costs

Actual Operating Income = $284,000 - $236,000 - $29,000

Actual Operating Income = $19,000

Now, we can calculate the sales volume variance in terms of operating income:

Sales Volume Variance (Operating Income) = (Actual Units Sold - Budgeted Units Sold) * Contribution Margin per Unit

Sales Volume Variance (Operating Income) = (45,000 units - Budgeted Units Sold) * $1.0667

Learn more about volume variance here,

https://brainly.com/question/32162518

#SPJ11

WRITE NOT LESS THAN 900 WORDS
1) Distribution networks comprise multiple combinations of transportation, facilities, and inventory configurations. The different configurations can have major implications on the business strategies of firms. That is why firms usually manage multiple distribution networks at the same time. How does the distribution strategy/plan of Jumia affects its distribution network configurations? (feel free to draw a diagram and develop your own score card for evaluation). Discuss in detail how Jumia manages its distribution cost tradeoffs, and how it justifies the costs with higher customer responsiveness rates?

Answers

Jumia, as an e-commerce platform operating in various African countries, implements a distribution strategy that significantly impacts its distribution network configurations. Jumia's distribution strategy focuses on achieving efficient and timely delivery of products to customers while managing costs effectively.

To manage its distribution network configurations, Jumia utilizes a combination of transportation modes, including partnerships with local delivery services, third-party logistics providers, and its own fleet of vehicles. The company establishes warehouses and fulfillment centers strategically located to optimize inventory management and reduce delivery times. Additionally, Jumia leverages technology, such as route optimization algorithms and real-time tracking systems, to streamline its distribution processes.

In terms of distribution cost tradeoffs, Jumia employs various measures. Firstly, it consolidates shipments to minimize transportation costs and reduce the number of individual deliveries. This approach enables Jumia to benefit from economies of scale. Secondly, the company strategically selects its warehouse locations to minimize transportation distances and costs. By positioning warehouses closer to customer clusters, Jumia can achieve faster and more cost-effective deliveries.

To justify these costs, Jumia focuses on enhancing customer responsiveness rates. The company invests in customer service infrastructure, providing reliable communication channels and prompt issue resolution. Jumia's distribution network configurations enable faster order processing and shorter delivery times, resulting in higher customer satisfaction and loyalty. By prioritizing customer responsiveness, Jumia aims to differentiate itself in the competitive e-commerce market and build a reputation for reliable and efficient service.

Overall, Jumia manages its distribution cost tradeoffs by optimizing transportation, facility, and inventory configurations. The company's distribution strategy aims to strike a balance between cost efficiency and customer responsiveness, ensuring timely deliveries while minimizing operational expenses. This approach supports Jumia's goal of providing a positive customer experience, which is essential for its long-term success in the e-commerce industry.

To know more about distribution click here:

https://brainly.com/question/29664127

#SPJ11

what happens if i register for fall classes and take summer classes but don't pay the tuition right away

Answers

The specific consequences of not paying tuition for summer classes before registering for fall classes can vary depending on the policies and procedures of the educational institution you are attending. However, here are some general points to consider:

Holds on registration: If you have an outstanding balance from the summer classes, the educational institution may place a hold on your registration for the upcoming fall semester. This means you may not be able to add or drop classes, access academic resources, or participate in other registration-related activities until the balance is cleared. Late fees and financial penalties: Not paying tuition on time may result in the imposition of late fees or financial penalties. These additional charges can increase the overall amount you owe and may need to be paid before registering for future classes or obtaining official transcripts. Withholding of services: Some institutions may withhold certain services or privileges until tuition payments are made. This could include denying access to the library, gym facilities, or other campus resources.

To learn more about registering, https://brainly.com/question/14365219

#SPJ11

good identity theft protection includes restoration services. true or false?

Answers

True. Good identity theft protection includes restoration services. Restoration services are essential in helping victims recover from identity theft.

They assist with the process of repairing credit, disputing fraudulent transactions, and re-establishing one's identity. Including these services in an identity theft protection plan ensures that victims receive comprehensive support, making it easier to regain control of their personal and financial information.

To know more about Restoration visit :-

https://brainly.com/question/9126728

#SPJ11

Other Questions
In listening to Mark Allen and Fritz Kron, it sounds like they believe that having a good communication system is the key to effectively treating patients. This is an (external or internal?) explanation for communication behavior. Suppose that a manager at Intermountain Healthcare had an employee who wasnt performing very well on the job. Instead of checking to see if the communication system was working properly, the manager just assumed that that the employee didn't have the ability to do medical work. This is an example of (the defensive bias or the fundamental attribution error?)Mark Allen, a Clinical Information Systems Manager at Intermountain Healthcare, must work with others to coordinate communication processes across 22 hospitals and over 300 clinics. If the senior executives at Intermountain Healthcare create weekly podcasts that are distributed to all employees, then this is an example of what communication concept?-Downward communication-Horizontal communication-Informal communication-Upward communicationUse your knowledge of the different concepts related to the communication process to classify the following statement or situation according to the appropriate definition.Example Encoding Channel Decoding FeedbackMark Allen, a Clinical Information Systems Manager at Intermountain Healthcare, must work with others to coordinate communication processes across 22 hospitals and over 300 clinics. If the senior executives at Intermountain Healthcare create weekly podcasts that are distributed to all employees, then this is an example of what communication concept? Suppose that Marc Harrison, the president and CEO of Intermountain Healthcare asked Fritz Kron about the best way to get out a company-wide announcement about hospital and clinic changes due to COVID-19. According to your text, what should Fritz tell Marc to use?a. -In-person meetingsb. -Slackc. -Yammerd. -Email ons ve bring 1 ort Ticket The following excerpt from "Trail of Tears: Our Removal" supports which of the following themes? "You would think the struggle would be over between the two worlds in this place that is now our knowledge, our new belonging, our being, and we'd never again care for the notion of maps or American wars, or the god of their sky, thinking of those things we were forced to leave behind, living country, stolen home, the world measured inch by inch, mile by mile, hectares, all measurements, even the trail of our tearspride n heritagehow non-native and native Americans interact and regard one anotherAttachment to ancestral valuesA deep reverence for the land You are an American business person who has been given a work assignment in Saudi Arabia where you will be spending a year getting a large project started. Most of your work will involve interacting, negotiating, and socializing with host country nationals. 1. How would you prepare for this assignment to make sure you succeed in the country? 2. What factors do you need to keep in mind? Explain and use examples. briefly explain what is meant by the term efficiency continuum company xyz know that replacement times for the quartz time pieces it produces are normally distributed with a mean of 12.6 years and a standard deviation of 0.9 years.find the probability that a randomly selected quartz time piece will have a replacement time less than 10 years? adolesant halo vest for cervical fracture nursing encourage flexion and extention of neck Which two Eocene superfamilies may have given rise to strepsirhines and haplorhines?Homo Erectus and AustralopithecusAdapoids and OmomyoidsFlintstones and RubblesHomo Erectus and AustralopithecusLemurs and Lorises What is the meaning of "we call a class R an n-ary relation if all its elements are n-tuples"? Following severe flooding, residents had to use water from an overflowing reservoir located near the village. Although they treated the water with the recommended amount of chronic bleach, many of chronic bleach, many of them still became very ill. Based on your knowledge of water purification and pollutants, explain what the residents were trying to achieve by treating the water with bleach and why this treatment was NOT enough to ensure that the water was safe for human consumption. A Review Constants A crystal of calcite serves as a quarter-wave plate; it converts linearly polarized light to circularly polarized light if the numbers of wavelengths within the crystal differ by one-fourth for the two polarization components. The refractive indexes for the two perpendicular polarization directions in calcite are n = 1.658 and 1.486. Part A For light with wavelength 589 nm in air, what is the minimum thickness of a quarter-wave plate made of calcite? Express your answer with the appropriate units. ? d = Value Units (1 point) By the Intermediate Value Theorem, the equation cos(x) = 4x4 has a solution in the interval (a, b) = You may choose an interval of any length. Preview My Answers Submit Answers Delegating Some managers are comfortable fully delegating an assignment to subordinates; others are not. Yet, delegation can be learned. To achieve the full advantages of delegation, it must be done properly. As the text suggests, effective delegation proceeds through several steps. As we look at organizations and recognize that authority is spread out over various levels and spans of control, the issue of delegation becomes paramount. Delegation is the assignment of authority and responsibility to a subordinate at a lower level. It often requires that the subordinate report back to his or her boss about how effectively the assignment was carried out. Delegation is perhaps the most fundamental feature of management, because it entails getting work done through others. Thus, delegation is important at all hierarchical levels. The process can occur between any two individuals in any type of structure with regard to any task. The goal of this activity is to understand the steps necessary for effective delegation This activity is important because it will demonstrate how authority and control work in an organization. Instructions: Match the description of the activity to the appropriate step in the process. Define the goal succinctly. Follow through by discussing progress at appropriate intervals. Give the subordinate the authority, time and resources to perform the assignment. Solicit the subordinate's views about the suggested approaches. Select the person for the task. Schedule checkpoints for reviewing progress. < Prey 1 of 1 Next > Match each of the options above to the items below. Step 2 Step 6 Step 3 Step 5 Step 4 Step 1 pls solve both of them i willrate ur answerExample 1: Find the parametric representation of: (c) Elliptic paraboloid z = x2 + 4y2 20. Wikipedia is the largest example of successfully pooling resources from the online community by soliciting contributions from a large group of people. Wikipedia is an example which concept?modernizationgentrificationcrowdsourcingtechnological advancement If a resident wanted to create a plan to address homelessness, the first step would be to? The curve with equation y^2 = 5x^4 - x^2 is called a kampyle of Eudoxus. Find an equation of the tangent line to this curve at the point (1, 2). How do you describe weather in past tense? Of the following good practices, which factor is the most crucial for any organization to work effectively?A. safe facilities with good lightingB. full agreement on what needs to be doneC. abundant capital for operationsD. good information-technology/systems Does lim 2x+y (x,y) (0,0) x2 +xy4 + 18 the limit exist?" an advertising campaign in the usa by godiva that will cost $5 million dollars is expected to result in additional sales of 200 000 boxes of chocolate for a net profit of $20 per box of chocolates after subtracting all other costs except advertising costs. therefore it is profitable for godiva to a. advertise b. not advertise c. we do not know from the above information d. none of the above